Railway track systems Variant Vossloh System 300 / for Slab Lane Page: 119-07 Rail flange Skl 15 Installation instructions Correct The correct installation clamping position is achieved when the intermediate loop touches the rib of angular guide plate by tightening the sleeper screw. (max. Permissible air gap: 0.5 mm). A tightening torque of approx. ≤ 200 Nm is required. Wrong Intermediate loop does not rest, air gap is too large. Desired clamping force is not reached! installed pre-installed 8 7 6 5 4 3 2 1 Pos. 1 1 1 2 2 2 2 1 Number/Support point Intermediate level Base plate Intermediate level Plastic dowel Angular guide plate Rail clamps Sleeper screws with track Rail Designation Zwp 104 NT Grp 21 Zw 692 Sdü 25 Wfp 15a Skl 15 Ss 36 with Uls 7 60E2 Brief description Without scale/schematic diagram Date of issue 08/10