language

Choose a language

Search


Service


Turnouts and Crossings Turnouts Turnout descriptions Page: 311-01 Turnouts and crossings according to: - VDV-specifications Integrates the existing measurement systems (Measurement system A: Track 1435 and 1000; measuring system B:Track 1435; measuring system C: Track 1433; measuring system C1: Track 1435) are removed in future and are replaced by the identification "Operating system" with class S (Tram operation), M (Mixed operation) and E (Railway operation). - Industry standard track 1432, track extension according to UIC 710 - Regulations of DEUTSCHE BAHN AG - Special provisions by foreign operators The following turnout descriptions and alignment sheet for vignol-turnouts apply for VDV-measurement system C1, yet are used analogously for rest of the VDV measurement system and industry-standard turnouts. 1) Adjustment and choice positions vignol rail turnouts 2) EW 49a) -140 -1:6 Fsch (H) right and left 3) EW 49a) -140 -1:7 Fsch (H) right and left 4) EW 49a) -190 -1:7 Fsch (H) right and left 5) EW 49a) -190 -1:9 Fsch (H) right and left 6) EW 49a) -300 -1:9 Fsch (H) right and left 7) EW 49a) -500 -1:12 Fsch (H) right and left 8) Adjustment and choice positions grooved rail turnouts 9) EW 60Ri1b) - R=....m - 1:- Fz (Sp) right and left 10) Introduction crossover 60R1b) -....m track distance right and left 11) Double crossover 60R1b) -....m track distance right 12) Single crossover Turn 60R1b) - R=....m - Fz (Sp) right and left 13) Double brakes Turn 60R1b) - R=....m - Fz (Sp) right and left 14) Introduction crossing 60R1b)...∢... - (Sp) Page: 311-02 Page: 311-03 Page: 311-04 Page: 311-05 Page: 311-06 Page: 311-07 Page: 311-08 Page: 311-09 Page: 311-10 Page: 311-11 Page: 311-12 Page: 311-13 Page: 311-14 Page: 311-15 a) b) = also apply alternatively for 41E1, 54E4 and 60E2 = also apply alternatively for 60R2, 59R1 and 59R2 Without scale/schematic diagram Date of issue 08/10